防火門工程案例
No | Project Name | Contractor | Date |
---|---|---|---|
1 | A & A Works at Sands Macau Casino, 2F | Chi Hui Construction | 2010 |
2 | A & A Works at Venetian Macau Shopping Center | Chi Hui Construction | 2010 |
3 | Galaxy Macau – Banyan Tree Health Club & Swimming Pool | I.C.I.L | 2010 |
4 | Venetian Macau – Noddle Restaurant (WP-61554) | Minda Construction & Eng. | 2011 |
5 | Venetian Macau – Dynasty 8 Restaurant (WP-61551) | Minda Construction & Eng. | 2011 |
6 | Venetian Macau – Podium Level 4 (WP-61574) | Circle Engineering | 2011 |
7 | Venetian Macau • L04 Sheraton Executive Qub (WP-61583) | Luen Yick Tai Construction | 2011 |
8 | Venetian Macau – Sheraton Feast Restaurant (WP-61556) | Minda Construction & Eng. | 2011 |
9 | Venetian Macau – Level 1 Paiza Entry Lobby (WP-61528) | B.S.C Construction | 2011 |
10 | Venetian Macau • East External Facade (WP-61315) | Cheong Wai Man Constructor | 2011 |
11 | Venetian Macau • WP61587 | Lao Lek Engineering | 2011 |
12 | Venetian Macau – G/F (WP-62415) | Circle Engineering | 2011 |
13 | Venetian Macau – Congress Level 4 – Health Club (WP-61585) | I.CJ.L. | 2011 |
14 | Venetian Macau – Café SAR (WP-61561) | Cheong Wai Man Constructor | 2011 |
15 | Venetian Macau – South China (WP-61561) | Cheong Wai Man Constructor | 2011 |
16 | Venetian Macau – Level 3 Paiza Entry Lobby (WP-61528) | B.S.C Construction | 2011 |
17 | Venetian Macau – Xin Restaurant (WP-61553) | Wan Chung Construction | 2012 |
18 | Venetian Macau – Grand Orbit (WP-61552) | Wan Chung Construction | 2012 |
19 | Venetian Macau • WP61532 | Mei Cheong Construction | 2012 |
20 | Venetian Macau • North China & Cafe Makan Restaurant (WP-61559) | Cheong Wai Man Constructor | 2012 |
21 | Venetian Macau – Level 3 Paiza Street Level (WP-61538) | B.S.C Construction | 2012 |
22 | Venetian Macau – Congress FOH Level 4 & 5 (WP-61574) | Minda Construction & Eng. | 2012 |
23 | Venetian Macau – Paiza L03 Expansion, L01 Entry Lobby (WP-61415) | Circle Engneering | 2012 |
24 | Venetian Macau • SPA at Sheraton (WP-61532) | LCLL. | 2012 |
25 | Sands Shopping Center, Zara 1374 | Elegant Macau | 2012 |
26 | Venetian Macau – WP-66330 | Luen Yik Tai Construction | 2012 |
27 | Venetian Macau • Koufu Food Court | Success Base Eng. | 2012 |
28 | Venetian Macau • A & A Works at Parcel 1, L01 Slot Machines Room | Chi Hui Construction | 2013 |
29 | A & A Works at Venetian Macau – WP-68080 at B1 area | Circle Engineering | 2013 |
30 | MGM • L2L3 Corridor A & A Works | Sun Rise Engineering | 2013 |
31 | Wynn Macau – Green Room (Bridal Room) Enhancement | Trendzone (Macau) Co,,Ltd | 2013 |
32 | Venetian Shop# 2530 (Pita Ran) & 2531 (Leitaria 1 Son) | Fu Lei Fire Protection | 2013 |
33 | Venetian WP 953520 (Jumpin GYM) | Circle Engineering Co.» Ltd | 2013 |
34 | Galaxy Resort (金牌火鍋) | San Fong Seng Const. | 2013 |
35 | Elegant Seafood Restaurant Venetian Macau | Fu Lei Fire Protection | 2013 |
36 | Venetian Macau • A & A Works P0364 New Office for MEP Dept. & Security Room | Sat Ion Eng. Co. / Ltd | 2013 |
37 | A & A Works at Venetian Macau – WP-953620 Retail Expansion South L2 | Circle Engineering. | 2013 |
38 | Venetian Macau • Casino 5 High Umit Expansion #951751 | B.S.C. Construction | 2013 |
39 | Galaxy 1 Macau世紀金滿贵寅會 | ShenZhuang (Macau) Eng. | 2014 |
40 | Wynn Macau • Cleaner’s Room | IBI Macau | 2014 |
41 | COD – Section 88 Re-model | CSI | 2014 |
42 | Venetian Parcel 5 & 6, Shop No. 3009-3010 | Kai Mei Engineering | 2014 |
43 | Galaxy Resort Phase II • Ritz Carlton C004N178 Ballroom & Function Area | Pat Davie | 2014 |
44 | Galaxy Resort Phase II • ABWF | Circle Engineering | 2014 |
45 | Galaxy Resort Phase II • ABWF P2-C004N055 | San Fong Seng Const. & Eng. | 2014 |
46 | Galaxy Resort Phase II • ABWF C004N056 | Ever Work Construction | 2014 |
47 | Galaxy Resort Phase IIJW Marriott N072 Ballroom | Shen Zhuang (Macau) Eng. | 2014 |
48 | Galaxy Resort Phase II Retail Pitout C004N044 | Ever Rich Construction | 2014 |
49 | Galaxy Resort Phase II 3/F RC SPA | Hap Lei Wang Hing | 2014 |
50 | Galaxy Resort Phase II CTC39 • HOH | Chinney Timwill Construction | 2014 |
51 | Galaxy Resort Phase II Pak Lok Restaurant | ICON Project | 2014 |
52 | Galaxy Resort Phase II JW Marriott Fitness Center | Shen Zhuang (Macau) Eng. | 2014 |
53 | Galaxy Resort Phase II | Sundart Engineering | 2014 |
54 | City of Dream • Shinji by Kanesaka | Team Work Construction Ltd | 2015 |
55 | Venetian Parcel 5&6 WP951850 Theatre 6 | Circle Engineering Co., Ltd | 2015 |
56 | Galaxy Resort Phase II Sky Casino | Shen Zhuang (Macau) Eng. | 2015 |
57 | Venetian Parcel 5&6 T5B • WP61520 | Circle Engineering Cow Ltd | 2015 |
58 | Venetian Phase 1 – RFC 1523 | Kai Mei Engineering | 2015 |
59 | MMO Office in Sands Cotai | Kai Mei Engineering | 2015 |
60 | Galaxy Boardway • SPA Block 2/F | 駿匯工程 | 2015 |
61 | Venetian Phase U WP972850 New Shroff Office | Minda Construction & Eng. | 2015 |
62 | MGM Macau (Renovation) | WIT Engineering | 2015 |
63 | Studio City – Pacha Macau | CSI | 2015 |
64 | Venetian III – WP31530 Bus Depot | Top Builder Group | 2015 |
65 | Venetian III – WP31850 Level 5 Congress | Minda Construction & Eng. | 2015 |
66 | Venetian WP31780 Level 03 FBB Brasserie | Space Construction Eng. | 2015 |
67 | Galaxy Hall 5 Restaurant | Trendzone (Macau) Co. Ltd | 2015 |
68 | Venetian III Main Gaming LI, LG, B1 | Minda Construction & Eng. | 2015 |
69 | MGM Macau • BOH EDR Dept, | WIT Engineering | 2015 |
70 | Venetian III-WP31510 High Limit Level 1 | Minda Construction & Eng. | 2016 |
71 | Venetian WP • 31730 Cafe Express, Level 01 | San Fong Seng Const. & Eng. | 2016 |
72 | Venetian WP • 31720 Level 03 | Space Construction Eng. | 2016 |
73 | Galaxy • AG Conversation to Horizon Junket | 新協隆建築工程 | 2016 |
74 | Venetian III WP – 31870 Podium Hotel Facilities Fit-Out at SPA/Frtness | Yearfull Contracting | 2016 |
75 | Venetian III WP – 31890 Theatre | Top Builder Group | 2016 |
76 | Venetian III WP – 31530 Eiffel Tower • ELV Room & AV Control at L5 | Top Builder Group | 2016 |
77 | Venetian III WP – 31810 Podium L03 Paiza Casino | B.S.C. Decorative Engg. | 2016 |
78 | Venetian III WP – 31770 Eiffel Tower Restaurant | Top Builder Group | 2016 |
79 | Venetian III WP – 31790 Podium Restaurant at L3 (Chinese Restaurant) | Vaford Contracting | 2016 |
80 | Venetian III WP – 31520 Hotel Receiption & Public Circulation | Yau Lee Construction | 2016 |
81 | MGM Cotai BOH for Podium & Hotel | China State JV | 2016 |
82 | COD Crown Hotel L25 & L26 Re-model | CSI | 2016 |
86 | MGM Cotai C307 – Vista, Convention, Ballroom | ICON Project | 2016 |
87 | MGM Cotai XO, Hao, Pot, Five Foot Road, WestCoast Rest | Junpam Eng. | 2016 |
84 | MGM Cotai C302 Mass Gaming Grand Halls | Pat Drive | 2017 |
85 | MGM Cotoi C306B – Theatre | ICON Project | 2017 |
83 | MGM Cotai C308AMOH, B1, B2, B3, & G/F Employee Lobby | San Terart Decoration | 2017 |
84 | MGM Cotai Presidents Club C315A | Vaford Contracting | 2017 |
85 | Venetian P1 L03 shop 3009 | Hoi Pak Engineering | 2017 |
86 | Wynn Palace BOH | Circle Engineering Co., Ltd | 2017 |
87 | Venetian WP958640 | Tong Lei Engineering & Construction | 2017 |
88 | Wynn Palace Villa Kitchen | 新永盛建築工程有限公司 | 2017 |
89 | Venetian WP951650 | Yearfull Contracting | 2017 |
90 | MGM Cotai C307 – Vista, Convention, Ballroom | ICON Project | 2017 |
91 | Venetian R697 Apple Macau SCC | Yearfull Contracting | 2017 |
92 | Venetian WP958050 | Yearfull Contracting | 2017 |
93 | Venetian Food Court No.2506A Calbee | 焯盈建築設計工程有限公司 | 2018 |
94 | Venetian Food Court No.2506 添好運 | 萬創工程有限公司 | 2018 |
95 | Sands Cotai Lady M | 三元建築工程有限公司 | 2018 |
96 | WNG LEI Restaurant | Pat Davie (Macau) Ltd. | 2018 |
97 | 澳門美高梅二樓德晉會 | 新永興裝修工程 | 2018 |
98 | 北安01地段多功能政府大樓 | China Constructiion | 2018 |
99 | MGM Cotai B1 Office | New Cheong Kong EngineeringCo., Ltd | 2018 |
100 | Parisian Rooms Conversion J3702 | Yearfull Contracting | 2018 |
101 | Galaxy Apple Shop | Yearfull Contracting | 2018 |
102 | City of Dream – Bubble Theatre | 栢聯建築工程 | 2018 |
103 | Wynn Macau 201-17-036 Wing Lei Restaurant | 新 永 盛 建 築 工 程 有 限 公 司 | 2018 |
104 | Sand Cotai Cheesecake Factory | Tong Lei Engineering & Construction | 2018 |
105 | SunCity Enhancement Work (2320020940) | Min Da Construction Engineering Co., Ltd. | 2018 |
106 | Wynn Palace GF BOH Toilet | Sat Ion Engg. Co., Ltd | 2018 |
107 | Venetian – Lei Gardan Restaurant | UNIPRO Engineering Company Limited | 2019 |
108 | Londoner Macao CN002 | Top Builders Group Ltd. | 2019 |
109 | Galaxy – Tsui Wah Refurbishment | 新協隆建築工程 | 2019 |
110 | Galaxy – Café de Pairs Improvement Works | 新協隆建築工程 | 2019 |
111 | Star Word L06 Sun City Junket | 新協隆建築工程 | 2019 |
112 | Studio City – Legand Heroes Phase 2 | 寶正建設有限公司 | 2019 |
113 | Sands Cotai L2 – Shop 2203d & 2203e | 中天防火建材有限公司 | 2019 |
114 | Macau Theme Park | Jangho Group | 2019 |
115 | Wynn Palace – Palace Café | Pat Davie (Macau) Ltd. | 2019 |
116 | St. Regis Bar | Yearfull Contracting | 2019 |
114 | Wynn Palace F&B Academy | 新永盛建築工程有限公司 | 2019 |
118 | Venetian C5 Tunnel | Tong Lei Engineering & Construction | 2019 |
119 | Venetian Service Apartment Hotel Tower – Fitting Out Package B | Sundart Engineering | 2019 |
120 | Venetian Service Apartment L38-L40 | Yearfull Contracting | 2019 |
121 | Venetian Parcel 1 High Limits F & B | Tong Lei Engineering & Construction | 2020 |
122 | Four Season Hotel | Top Builders Group Ltd. | 2020 |
123 | Wynn Palace 300-26-042 Tower Metal Doors Replacement Works | 新永盛建築工程有限公司 | 2020 |
124 | Venetian L03 Paiza and FB8 Londoner Club Lounge (Package 9B) | Yearfull Contracting | 2020 |
125 | Venetian Japanese & Ramen F&B | Grand Flag Engineering Co., Ltd | 2020 |
126 | Londoner 10B – Conrad Hotel Check in Area | Vaford (Macau) Company Ltd. | 2020 |
127 | Retail L1 North – Apple Promenade & St. Regis Corridor | Pat Davie (Macau) Ltd. | 2020 |
128 | Venetian Orient Parcel 5&6 Level 1 Public Circulation (N&S) Souvenir Shop & Retail Units & FB3 Tim Ho Wan (10E) | Pat Davie (Macau) Ltd. | 2020 |
129 | Venetian Orient Parcel 5&6 Central Spine L1-L4 & East Entry Lobby (10D) | Pat Davie (Macau) Ltd. | 2020 |
130 | Londoner FB04 – The Mews | San Fong Seng Con. & Engg. Co., Ltd. | 2020 |
131 | Londoner FB5 4 Neak Restaurant | Chong S Interior Design & Con. Ltd. | 2020 |
132 | Londoner FB11 – The Conservatory | Vaford (Macau) Company Ltd. | 2020 |
133 | Londoner – P1901 | Top Builders Group Ltd. | 2020 |
134 | Sands Relaxation Pods | San Fong Seng Con. & Engg. Co., Ltd. | 2020 |
135 | Londoner 10N – P1904 | Top Builders Group Ltd. | 2020 |
136 | Venetian Parcel 5^6 – Bene F&B Base Build | Tong Lei Engineering & Construction | 2020 |
137 | Galaxy 3A GF Lift Lobby & Level 2 Main Lobby | Wai Hung Hong Engg. (Macau) Co., Ltd. | 2020 |
138 | Sands Slot High Limit – P1350 | Wai Hung Hong Engg. (Macau) Co., Ltd. | 2020 |
139 | Londoner Club Lounge FB14 – Paiza Kitchen | Yearfull Contracting | 2020 |
140 | Wynn Macau – Ramen Vestibule Area | 新永盛建築工程有限公司 | 2020 |
141 | Londoner Club Lounge FB14 – Paiza Kitchen | Yearfull Contracting | 2020 |
142 | Wynn Macau – Ramen Vestibule Area | 新永盛建築工程有限公司 | 2020 |
143 | Galaxy P3D | Tong Lei Engineering & Construction | 2020 |
144 | Sands Cotai L2 Public Circulation | Min Da Construction Engineering Co., Ltd. | 2020 |
145 | Londoner Club Lounge Package 9A3 – Junket 3 BOH | Yearfull Contracting | 2020 |
146 | Venetian SCC L2 Chinese F&B | Grand Flag Engineering Co., Ltd | 2020 |
147 | Venetian T5B – Service Apartment | Sundart Engineering | 2020 |
148 | Expo Entrance 220-00076-40 | Circle Engineering Co. Ltd. | 2020 |
149 | Broadway 3/F PD New Office | Trendzone (Macao) Co., Ltd. | 2020 |
150 | Venetian Premium Cantonese F&B | Grand Flag Engg. Com. Ltd. | 2021 |
151 | 華蘭台工聯活動中心 | 偉潮捲閘鐵器工程 | 2021 |
152 | MGM Macau Square 8 | Zeko Conn. & Engg. Co. Ltd. | 2021 |
153 | Venetian Shop 1036 Café Deco | Tong Lei Engineering & Construction | 2021 |
154 | Studio City – Entrance Portal | San Fong Seng Con. & Engg. Co., Ltd. | 2021 |
155 | Studio City – Contract M1001 | Tyco Fire, Security & Services (Macau) Ltd. | 2021 |
156 | Galaxy Phase III – 3C N059 & N039 | San Fong Seng Con. & Engg. Co., Ltd. | 2021 |
157 | Galaxy Phase III – 3C N038 | 深裝(澳門)工程有限公司 | 2021 |
158 | Galaxy Phase III – 3C N046 & N037 | 新特藝達裝飾設計工程(澳門)有限公司 | 2021 |
159 | Broadway Spicy Hot Pot | Chinney Timwill Conn. (Macau) Co. Ltd. | 2021 |
160 | Galaxy Phase III – 3C N033 | Chinney Timwill Conn. (Macau) Co. Ltd. | 2021 |
161 | Galaxy Phase III – 3B | 建鵬建築工程有限公司 | 2020-2021 |
162 | Galaxy Phase III – 3A – N048 | 深裝(澳門)工程有限公司 | 2020-2021 |
163 | Galaxy Phase III – 3A | 新福港-權暉建築工程有限公司 | 2020-2021 |
164 | Venetian Shop SAV 2442S | SJ Synergy Engg. Co. Ltd. | 2021 |
165 | Londoner Elizabeth Tower P1901 | Top Builders Group Ltd. | 2021 |